Data centers

Gas-supply pressure.
Power and cooling.

Recover energy from gas-pressure reduction at gas-powered data centers, generating electricity with expansion cooling that can contribute to the server park’s cooling loop.

Data-center server aisle

The opportunity

More value from
the gas supply.

WEX²® recovers a significant part of the pressure energy available where incoming gas is reduced to the pressure required by on-site generation. The turboexpander converts over 80% of the available gas expansion energy into shaft power. Electrical output can supply the facility, while expansion cooling can contribute to the server park’s cooling loop through a separate heat-exchange circuit.

How WEX²® works
01

Pressure-energy recovery

Turn the required gas-supply pressure reduction into useful electrical power before the gas reaches on-site generation.

02

Electrical integration

Assess recovered output alongside site demand, electrical infrastructure and the operating profile of the gas-fired generation.

03

Cooling integration

Transfer available expansion cooling through a heat exchanger into the server park’s cooling loop, matched to its temperature and capacity requirements.

Project development

Built around
your operating reality.

A project-specific assessment establishes recoverable power, process effects and the preferred integration concept.

  • Gas-supply conditions

    Available flow, inlet pressure and the required delivery pressure determine the recovery opportunity.

  • Cooling requirements

    The server park’s supply and return temperatures, cooling duty and process interfaces define the cooling-loop integration.

  • Continuity of supply

    The retained pressure-control bypass and isolation arrangement support continued gas supply when WEX²® is isolated.

Delivery

The right route
for the project.

Operator-owned integration or Energy-as-a-Service can be assessed around the data center’s gas supply, power demand and electrical interfaces. Equipment scope, site responsibilities and energy offtake are agreed for the project.

Compare deployment models

Let’s assess your
data-center opportunity.

Share your operating conditions. We can help establish the opportunity and the right next step.

Request an assessment