Engineering

From operating data
to a defined project.

Screening, concept development and pre-FEED that connect the WEX²® energy opportunity with real process and operational requirements.

Our approach

Make the next decision
with a stronger basis.

Each stage answers a different question and builds on the information available.

01 / HIGH-LEVEL ASSESSMENT

Is there an opportunity?

An initial technical screen identifies the available energy and the constraints worth investigating.

  • Operating data and gas-property review
  • Indicative power and heat balance
  • Initial integration options
  • Key assumptions and data gaps
02 / CONCEPT DEVELOPMENT

Which configuration fits?

Compare configurations and evaluate how WEX²® affects the complete facility.

  • Process simulation and operating cases
  • Heat and cooling integration
  • Equipment and interface definition
  • Energy, emissions and economic assessment
03 / PRE-FEED

What does the project need?

Develop the selected concept into a basis for the next project phase.

  • Design basis and equipment requirements
  • Control and protection philosophy
  • Layout, tie-ins and battery limits
  • Development scope and execution inputs

The complete facility

Energy performance
meets operational experience.

A useful concept must work for the people who will operate and maintain it.

  • Process engineering

    Gas processing, heat integration, gas conditioning and facility energy balances.

  • Rotating-equipment integration

    Expander duty, operating range, vendor interfaces and auxiliary requirements.

  • Operations and production

    Normal and off-design operation, maintenance, production forecasts and facility constraints.

  • Project economics

    Annual energy recovery, heat demand, integration costs and sensitivity to the operating basis.

Start with the data
you already have.

A short asset description and indicative operating conditions are enough to begin the conversation.

Request an assessment